Based on energy audit recommendations leading to a performance contract, conservation measures included a new chilled water loop and retrofit from propane to natural gas for water heaters and kitchen equipment. Resulting energy savings will range from $8-15 million over the next 10 years.
As Construction Manager, Dave Rosenof utilized the information obtained by Energy Engineers to create constructability studies, estimates, schedules and site logistics and planning.
This work was completed by Dave while employed by Siemens Industry.